SERVICES

Oil&Gas Services

Logo +NR
Oil and gas engineering services — offshore platforms, FPSO modifications and subsea engineering by +NR

OIL & GAS ENGINEERING SERVICES

We deliver integrated engineering and project solutions for the oil & gas industry, from surface facilities and subsea layout design to FPSO/platform adaptations, process optimization, and low-carbon innovations to support the energy transition.

Onshore Structural Systems

Onshore Structural Systems

Structural engineering for industrial buildings and process facilities, sized for heavy-duty operations and the real loads of oil and gas plants.

  • Engineering and design of industrial buildings and support facilities

  • Structural design for silos, storage tanks, pipe racks, and equipment foundations

  • Civil works for platforms, drainage systems, and site access roads

  • Steel and concrete structures for heavy-duty operations

  • Modular and pre-fabricated building systems for industrial applications

Onshore Production Systems

Onshore Production Systems

Piping, valves and tie-ins for onshore production. Layouts that account for maintenance access, future expansion and operational reality, not just nominal flow.

  • Piping design and layout for process and utility systems

  • Valve stations, manifolds, and pipeline configuration

  • Pipe racks and supports for fluid and gas transport

  • Integration of instrumentation and control systems for surface facilities

  • Tie-ins for gathering, separation, and storage systems

Subsea Structural Equipment

Subsea Structural Equipment

Structural equipment for subsea production fields. We engineer the components that anchor a development on the seabed and survive 25 years of operation.

  • Manifolds, PLEM, PLET, and ILT

  • UTAs (Umbilical Termination Assemblies) and SDUs (Subsea Distribution Units)

  • SSIV bases (Subsea Isolation Valves)

  • Tool baskets and jumper deployment frames

  • ROV tools and intervention equipment

Well Systems

Well Systems

Wellhead and Christmas tree systems for surface and subsea applications, plus workover and intervention equipment that operators actually use day to day.

  • Surface wellheads and Xmas Trees

  • Dry and Wet Xmas trees

  • Workover systems

  • Vertical and horizontal connectors

  • Valves and pipelines

Control Systems

Control Systems

Topside and subsea control systems, sensors and power distribution. The intelligence layer that makes the rest of the field measurable and controllable.

  • Field distribution systems (hydraulic, chemical, power & communications)

  • Subsea control modules and sensor equipment

  • Topside control systems

  • Topside power stations and control cabinets

  • Hydraulic Power Units (HPUs), pumps, and topside distribution systems

Subsea Umbilicals & Risers Systems

Subsea Umbilicals & Risers Systems

Umbilicals and risers for transporting fluids, signals and power between seabed and topside. Configuration, routing and installation engineering for the harshest environments.

  • Umbilical configuration and routing definition

  • Flexible and rigid riser system design

  • Installation planning and field configuration

Subsea Equipment Testing & Inspection

Subsea Equipment Testing & Inspection

Independent third-party verification of subsea equipment before it goes underwater. From factory acceptance testing to in-service inspection plans, we run programs that catch problems on land, not 1,500 meters down.

  • Factory Acceptance Testing (FAT) and System Integration Testing (SIT) programs

  • Pre-installation testing for subsea trees, manifolds and connection systems

  • In-service inspection planning and structural integrity assessment

  • Failure analysis and root cause investigation for subsea equipment

R&D for Oil & Gas

R&D for Oil & Gas

Applied research and development for upstream and downstream operations. We work with operators to qualify new technology, run pilot programs and de-risk innovation before it touches production.

  • Technology qualification programs aligned to DNV-RP-A203 and API standards

  • Pilot and prototype design for new subsea, FPSO and refining technology

  • Joint industry projects (JIPs) and collaboration with universities

  • Digital twin development for production optimization and decarbonization R&D

Oil & Gas

Strategic Design & Quality Assurance in Oil & Gas

01
Oil & Gas

Project Definition & Feasibility

  • Conduct feasibility studies and technical assessments
  • Define scope, battery limits, and compliance with API/ISO standards
02
Oil & Gas

Engineering & System Design

  • Design mechanical, electrical, and subsea systems (FEA/FIV analysis)
  • Develop control systems and umbilical layouts
03
Oil & Gas

Quality Assurance & Execution

  • Implement QA/QC procedures and risk assessment actions
  • Oversee fabrication, testing, and commissioning
Cómo trabajamos

Proyectos de petróleo y gas, en la práctica

Cómo +NR aborda decisiones en proyectos reales de petróleo y gas: metodología, alcance, calificación tecnológica y trade-offs.

¿Cómo definen el alcance de un nuevo proyecto de ingeniería en petróleo y gas?

Aplicamos análisis de stakeholders y desarrollo de concept-of-operations del INCOSE para entender la restricción real del operador: ¿es cronograma, capital, regulatorio u operabilidad? El alcance se deriva de eso, estructurado en torno a análisis top-down de requisitos. Un desarrollo de campo guiado por fecha de primera producción es muy diferente a uno guiado por límites de capex. Dejar esto claro en las primeras 2 semanas a través de gate reviews estructurados evita el 80% del retrabajo que ocurriría después.

¿Qué hace +NR de diferente en proyectos de modificación de FPSO?

Aplicamos verificación y validación V-Model (INCOSE) contra el casco y sistemas existentes como restricciones inmóviles, diseñando nuevos módulos para caber dentro de ellos a través de design readiness reviews. Suena obvio, pero la mayoría de las modificaciones de FPSO se exceden en presupuesto porque los nuevos equipos se dimensionan para layouts ideales y luego se fuerzan en el espacio de cubierta disponible. Nuestra disciplina de trazabilidad de requisitos garantiza que dimensionamos para lo que está realmente ahí desde el día uno.

¿Cómo abordan la revitalización de campos maduros?

La madurez de un campo no es un problema técnico, es económico. Aplicamos trade studies del INCOSE para modelar el perfil de producción remanente contra cronogramas de capex, opex y desmantelamiento, y diseñamos intervenciones que se pagan dentro del envelope de producción. A veces eso significa nuevos pozos; frecuentemente significa optimizar lo que ya está ahí. La ingeniería sigue a la economía a través de value engineering estructurado, no al revés.

¿Cuándo recomiendan programas de pruebas de equipos subsea?

Siempre antes de la instalación, y selectivamente en servicio. Aplicamos principios de V&V del V-Model (INCOSE): Factory Acceptance Testing identifica problemas de fabricación, System Integration Testing identifica problemas de interfaz entre subsistemas. La inspección en servicio tiene sentido para componentes con modos de degradación conocidos (umbilicales, risers flexibles, líneas de anclaje), menos para equipos estáticos que raramente fallan. Elegir dónde gastar presupuesto de inspección es parte del trade study de ingeniería.

¿Cómo conduce +NR I+D para operadores de petróleo y gas?

A través de programas estructurados de calificación tecnológica alineados a DNV-RP-A203 o API 17N, con gates al estilo INCOSE entre etapas de TRL. Trabajamos con operadores para definir el objetivo de calificación, diseñar programas de prueba, conducir pilotos y documentar evidencia dentro de un sistema de calidad ISO 9001:2015. El resultado es algo que un operador puede presentar a comités internos de revisión y poner en un activo de producción, no un paper de investigación.

¿Cuál es el modelo típico de contratación en petróleo y gas: estudio, FEED, EPCM o todos?

La mayoría de las contrataciones corren como FEED (Front-End Engineering Design, 4 a 9 meses, estructurado en INCOSE) o EPCM (12 a 36 meses, gestionado por PMBOK). Los estudios conceptuales son de 6 a 12 semanas. Los operadores que contratan al mismo equipo en FEED y EPCM tienden a tener menos retrabajo, porque la intención de diseño se preserva por la verificación V-Model. Trabajamos en cualquier configuración que el operador necesite, con la misma metodología aplicada de forma consistente.

¿Cómo aplica +NR INCOSE y PMBOK en proyectos de petróleo y gas?

Usamos la Ingeniería de Sistemas INCOSE como disciplina de diseño (trazabilidad de requisitos, verificación y validación V-Model, MBSE, FMEA para componentes críticos de riesgo) y PMBOK como disciplina de gestión de proyectos (WBS, baselines de performance, change control boards). La mejora continua se gobierna por CMMI e ISO 9001:2015. La combinación es lo que llamamos la metodología +NR, descrita en detalle en nuestra página de metodología, y se aplica de forma idéntica a subsea, modificaciones FPSO, revitalización de campos maduros y contrataciones de I+D downstream.